Structural Rebuild covers load-bearing repair through final inspection, coordinated with your Dunbar building department at every stage.
📞 Call +1-866-484-1409 Now
Full GC oversight, not subcontracted piecemeal.
Load-bearing repairs meet current Dunbar, WV building code.
A written price and schedule before framing begins.
A defined timeline with milestones, not open-ended.

Load-bearing walls rebuilt to current Dunbar, WV code.
Fire-damaged trusses replaced with engineered lumber matched to span.
We manage the timeline so it doesn't stall the project.
Installed to code once framing passes inspection.
Trim, doors, and cabinetry complete the rebuild's finished look.
Certificate of occupancy coordinated with Dunbar inspectors.
A technician answers and lines up a structural evaluation.
Initial framing and load evaluation included.
You approve the plan and permits before construction.
Nothing closes out until final inspection passes.
"The framing repair passed inspection on the first try, which our contractor friend said doesn't always happen." — Homeowner, Dunbar
"Not dealing with the permitting office directly saved us a lot of stress." — Homeowner, Dunbar, WV
"We expected delays, but the rebuild finished close to the original timeline quoted." — Homeowner, Dunbar
Yes, we coordinate all required permits with your local Dunbar office.
Timeline varies with damage extent.
Licensed to manage the complete construction process.
When damage warrants it, engineer sign-off is included.
We provide the paperwork adjusters need.
Our Structural Rebuild teams cover Dunbar and the surrounding zip codes, with licensed GC oversight on every project.
